Main Street Corridor
The City of Cedar Falls is conducting a traffic study of the Main Street corridor from W. 6th Street to Seerley Boulevard. The city is asking for public input on potential improvements to this corridor with respect to the future rehabilitation of the roadway.

  • An informational meeting was on Tuesday, September 13th to gather input from the public. The following information was presented at the meeting:

Main Street Public Meeting Brochure
Main Street Complete Streets
Main Street Strip Map with Volumes
Main Street Crash Statistics
Main Street Cross Sections 6th to 17th
Main Street Cross Sections 18th to University

University Avenue Corridor
The University Avenue Reconstruction Project website was developed to provide information to the public about this project. You can visit the University Avenue Reconstruction Project web page for more information on this project.

Highway 58 Corridor
The City of Cedar Falls and the Iowa Department of Transportation is conducting a corridor study for intersection improvements along Highway 58 in southern Cedar Falls. Select the link to view the Technical Memorandum of the IA 58 Over/Under Review at the intersection with Viking Road.

  • A public informational meeting concerning the Iowa 58 and Viking Road interchange was held on Tuesday, November 15, 2016 at the Public Works Facility, 220 Technology Parkway from 5:00 PM to 7:00 PM. Select the Public Informational Meeting flier for more information.

The following documents from this meeting are provided for your review:
Iowa 58 and Viking Road Presentation
Iowa 58 and Viking Road Corridor
Iowa 58 and Viking Road Aesthetic Treatments

  • A public hearing on the Environmental Assessment was on Tuesday, October 27, 2015 at the Public Works Facility, 2200 Technology Parkway from 5:00 PM to 6:30 PM.

The following links are provided for your review:
Environmental Assessment
Public Hearing Flier
Notice of Public Hearing and EA Availability
Highway 58 Corridor Improvement Study Video Presentation

  • The second public open house for this project was on Tuesday, May 6, 2014 at the Public Works Facility, 2200 Technology Parkway from 5:00 PM to 6:30 PM. The following documents were presented at the open house.

IA 58 Project Update No. 2 on 5-6-14
Public Meeting No. 2 Presentation
Public Meeting No. 2 Display Boards

  • The first public open house for this project was on Thursday, October 17, 2013 at the Public Works Facility, 2200 Technology Parkway from 5:00 PM to 6:30 PM. The following documents were presented at the open house. 

IA 58 Project Update No. 1 on 10-17-13
Highway 58 Corridor Improvement Study on 10-15-13

W. 1st Street Corridor
This corridor from Franklin Street to Hudson Road is being studied for a future reconstruction project.

The Environmental Assessment (EA) has been completed and the Finding of No Significant Impact (FONSI) is under review by the IDOT and FHWA. The next steps in the project include meeting with the IDOT to review the cost share for the project and initiate the final design. The anticipated schedule of events include final design in the summer of 2016 with construction in 2018.

  • A public hearing for the proposed improvements to W. 1st Street/Iowa 57 from Highland Drive to Franklin Street/Center Street was on Tuesday, November 17, 2015 from 5:00 to 7:00 pm at the Cedar Falls Community Center, 528 Main Street, Cedar Falls, Iowa. The following information was be presented at the public hearing:

W. 1st Street/Iowa 57 Environmental Assessment
W. 1st Street/Iowa 57 Public Hearing Notice
W. 1st Street/Iowa 57 Public Hearing Handout
W. 1st Street/Iowa 57 Corridor Strip Map
W. 1st Street/Iowa 57 Public Hearing Comment Sheet
W. 1st Street/Iowa 57 Public Hearing Video Presentation

  • The second public open house for this project was held on Tuesday, April 22, 2014 in the City Hall Council Chambers from 5:00 PM to 6:30 PM. The following information was presented at the open house.

    4-22-14 Open House Presentation Boards
    Meeting Handout
    W. 1st Street Alternative 1 - 4 lane roadway
    W. 1st Street Alternative 2 - 3 lane roadway
    W. 1st Street Alternative 3a - 5 lane roadway (67' wide)
    W. 1st Street Alternative 3b - 5 lane roadway (58' wide)

    • The first public open house for this project was held on Thursday, December 5, 2013. The following links with provide the information from the open house.

    Purpose and Need Statement
    Presentation Boards