Campus Street Bridge Replacement Project

All,

Beginning Monday, August 26, 2019 the contractor will be replacing the Campus Street bridge with a concrete box culvert. In order for the contractor to begin removal, a full width road closure will be required. The road closure will be in effect for three (3) months, depending on the weather. Below you will find a map with the closure area highlighted.

Campus Street  Bridge Replacement Project


For safety's sake, please stay away from the construction area. Heavy equipment will be moving back and forth on the closed street. It would be advisable to stay behind the sidewalk on the property side during the reconstruction work.

If you want additional information about the 2019 Street Construction Project, please visit the project web page at www.cedarfalls.com/StreetConstruction

If you want to receive road closure notices by e-mail, visit www.cedarfalls/notifyme and follow the instructions for road construction as shown.

If you have any questions or concerns during the course of construction you may contact me by phone, email or fax as listed below.


Thanks,

BEN CLAYPOOL, PhD, EI

Civil Engineer II


The City of Cedar Falls logo

City of Cedar Falls

Public Works | Engineering Division 

220 Clay Street | Cedar Falls, Iowa 50613

Office: 319.268.5161 | F: 319.268.5197

Email | Website | Facebook | Twitter